ADD :No.8 Long Ao North Road,Lixia            District,Jinan,Shandong,China

Post Code:250098

Site:www.sdhsg.com

Home » News

Shandong High-Speed Group held "air crossing" healthy running and More than 1,000 citizens experienced "The world's largest eight lane tunnel group"

2017-12-24

On 24th December, mountain scenery of Spring City  2017 Shandong High-Speed Group "air crossing" healthy running was launched in extension line of the South-east Second Ring of Jinan. More than 1,000 Jinan citizens participated in this healthy running event, experiencing "The world's largest eight lane tunnel group" and Shandong's largest urban highway interchange —— Bandao Jing Interchange.

The route is about 21 km long, taking most of the completed road sections of South-east Second Ring Project as race route: Jinan Xinglong toll station (starting point)  Daling Tunnel  Xiaoling Tunnel  Bandao Jing Interchange  Jiangshui Quan Tunnel  Longding Tunnel  Gang Gou Tunnel (end point). Besides provincial and municipal authorities, builders who participated in project construction and people living in project location also joined in this running. Everyone enjoyed the grandeur of South-east Second Ring Project, moving in the wide road.

Jinan Southeast Second Ring Project, invested 7.23 billion yuan by Shandong High-Speed Group, is located in southeast of Jinan City, which is the world's largest two-way eight-lane tunnel group. Jiangshui Quan Tunnel is the longest eight-lane highway tunnel in the world, with a length of 3101 meters. The length of Longding Tunnel, Laohu Shan Tunnel, and Gang Gou Tunnel rank 2nd, 4th, 5th in the world respectively. The highest Bandao Jing Interchange is 24 meters, covering 478 mu, equaling to the size of 16 football fields, which is the largest urban highway interchange in Shandong province. After two years of construction, the project will be opened at the end of December, a year ahead of schedule.

欢迎,您是第64234434 位访问者